Oct 2015

Floorboards are Coming Up

The Floorboards have been lifted…

They are coming up in preparation of the joists coming out.

Once the joists are out we can dig out the footings for the concrete base on the lower floor and then knock the partition wall into the hole for hardcore and get the concrete poured in.

Things are starting to get going which is very exciting.

Watch this space…

IMG_0834IMG_0836IMG_0832IMG_0835IMG_0838IMG_0839